1. The working surface of the feeding material should be kept at the lower part of the cutter, and the length of the worktable can be determined according to the length of the processing material.
2. Before starting, we should check and confirm that there is no crack in the cutter, the bolt is fastened and the protective cover is reliable. Then we should turn the belt wheel with our hands, check the gear meshing clearance and adjust the cutter clearance.
3. After starting, the rebar cutting machine should be transported by air first. We can operate it after the transmission parts and bearings have been checked.
4. When the machine does not reach the normal speed, the material must not be cut. When cutting, the middle and lower parts of the cutter should be used, and the rebar should be quickly put into the edge of the blade. The operator should stand on the side of the fixed blade to press the rebar, so that the end of the rebar could be prevented from popping. It is strictly prohibited to use two hands to divide the two sides of the blade to hold the steel bar to feed.
5. It is not possible to cut the diameter and strength beyond the rebars and the red-hot bars which are specified in the nameplate. When cutting off multiple bars at the same time, the total sectional area should be within the prescribed limits.
6. When cutting low alloy steel, high hardness cutter should be replaced, and the cutting diameter should conform to the nameplate requirement.
7. When we are cutting off the short material, the distance between the hand and the cutter should be kept above 150 mm, if the grip is less than 400 mm, the short head of the rebar should be pressed or fasten by the sleeve or fixture.
8. During operation, it is strictly prohibited to remove the broken ends and sundries near the cutter directly by hand. We can not stay at the site where there has no operators around the steel bar swings and the cutter.
9. When we find that the machine is running abnormally, and it appears abnormal noise or skew knife, it should be immediately stopped for maintenance.
10. After the operation, the power should be cut off, and the sundries between the cutting knives should be removed with the steel brush to clean and lubricate the whole machine.
11. Before the operation of the hydraulic transmission cutting machine, we should check and confirm that the hydraulic oil level and whether the rotation direction of the motor meet the requirements or not. After startup, it should be operated no-load, loosening the oil valve and drained the air in the hydraulic cylinder to cut the bar. After the machine is started, it should be operated with no load, we also should lose the oil valve and drained the air in the hydraulic cylinder to cut the bar.
12. Before using the manual hydraulic rebar cutting machine, the oil discharging valve should be tightened clockwise. After cutting, the oil discharging valve should be loosened counterclockwise immediately. During the operation, we should keep our hand steady to cut off, and wear the insulating gloves.
July 15, 2019Common fault treatment of wire mesh welding line machine:Screen black screen: first check whether there is power supply, power fuse, and whether the circuit between the screen and the main circuit boa...view
August 25, 2020The reinforced mesh welding machine can weld coal, mine and underground support mesh, iron mine underground mesh, all kinds of high-speed rail, tunnel, metro, and other support mesh. Pay attention to ...view
February 22, 2021The bar cutting machine is designed to cut all kinds of round rebar and deformed rebar to a fixed length. It is a typical rebar cutting processing equipment. Generally, there are two types of automati...view
March 3, 2020Rebar shear machine is a tool for cutting steel bars in construction engineering.Rebar shear machine is mainly divided into: full-automatic rebar shear machine and semi-automatic rebar shear machine. ...view
November 29, 2020In the station construction of modern engineering projects, reinforcement processing plant is top priority among the temporary works where the intelligent rebar processing equipment is an indispensabl...view
November 27, 20181. The section which from 200mm to 250mm is checked on the metal wire and the surface of the wire must not be damaged when straightening.2. There are four vertical holes on the main pulling rod. The h...view